|
|
|
Park 75 at Union Centre 2West Chester, OH
|
|
|
|
This one-story, state-of-the-art industrial building is located on Windisch Road, approximately 1.5 miles from I-75 and I-275, just 20 miles from downtown Cincinnati.
The facility features precast concrete walls, a 32-foot clear ceiling height and a single-ply, ballasted, EPDM roof.
Fire protection is provided by an ESFR sprinkler system with 75-psi end head pressure, electric fire pump.
Parking is provided for 163 automobiles (expandable), with 63 truck docks, 20 potential trailer spaces, and four drive-in doors. |
|
|
|
Location: 9841 Windisch Road Completion Date: September 2007 Contact:
The Opus Group - Indianapolis Office
317-705-0444
Awards: 2008
Industrial Deal of the Year National Association of Industrial and Office Properties (NAIOP)
|
|
|
|
|
|
|
|